With
the last prefabricated module assembled, the main structure of Changsha
Zhongjing Hospital was completed on the evening of April 15. Equipment
installation and commissioning for the makeshift hospital have begun in a
comprehensive way. The construction of the hospital will be completed
and the hospital will meet relevant conditions of operation at the end
of this month. The
hospital is located in the north of Changsha. More than 2,000 workers
have spent over 20 days and nights to build the hospital with a capacity
of 2,320 beds. The hospital will lay a solid foundation for Changsha to
do a better job in normalized epidemic prevention and control, respond
more forcefully and effectively to epidemic outbreaks, and protect the
health and safety of the people. Translator: Kuang Zhenzhen
Changsha to complete makeshift hospital construction at the end of this month
Editor:阮梓峰
Source:Hunan Daily
Updated:2022-04-18 17:28:16
Source:Hunan Daily
Updated:2022-04-18 17:28:16
Special
Contact
Welcome to English Channel! Any suggestion, welcome.Tel:0731-82965627
lisl@rednet.cn
zhouqian@rednet.cn